Immagini della pagina
PDF
ePub
[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][graphic][merged small][merged small][ocr errors]

Ashland, Ky., Works

MILL SCALE WATER
CLARIFICATION PLANT

Objectives

To remove practically all mill scale, oil and grease
before discharge into the Ohio River.

To clarify for re-circulation 78,000 gallons
of water per minute.

Estimated Cost

$8,500,000

Annual Operating Expense 1,000,000

Ashland, Ky., Works

OPEN HEARTH

AIR POLLUTION ABATEMENT

Objective

•Remove all but a very small percentage of

Iron Oxide Furnace Dust Particles which

escape into the air,

Estimated Cost

$6,500,000

Annual Operating Expense_425,000

Ashland, Ky., Works

HYDROCHLORIC ACID
REGENERATION PLANT

Objective

To eliminate discharge of practically all spent pickling solutions into the Ohio River.

Estimated Cost

$2,500,000

Annual Operating Expense_300,000

Baltimore, Md., Works

WATER POLLUTION ABATEMENT EQUIPMENT ON PICKLING UNIT

Objective

To eliminate discharge of spent
pickling solutions into the Back River.

Estimated Cost

$300,000

Annual Operating Expense 50,000

Baltimore, Md., Works
ELECTRIC FURNACE

AIR POLLUTION ABATEMENT

Objective

• To remove all possible particulate matter from spent gasses leaving electric furnace.

[blocks in formation]

To eliminate discharge of practically all mill scale, oil and grease into the Connoquenessing Creek.

To clarify for re-circulation 14,000 gallons of water per minute.

Estimated Cost

$3,000,000 Annual Operating Expense_300,000

Butler, Pa., Works

SPENT PICKLING SOLUTIONS DISPOSAL PLANT

Objective

To eliminate discharge of practically all spent pickling solutions and rinse water into the Connoquenessing Creek. This waste is treated with lime to make an Iron Hydroxide Solution which must be pumped to settling lagoons for permanent storage. (See photo on next page.)

[merged small][merged small][merged small][merged small][graphic]
« IndietroContinua »